Dates of Rail Engineering work on East Coast Mainline
Dates below are our tour dates affected by rail engineering work carried out on East Coast Mainline. Therefore, Da Vinci Code tour may not be available on these dates and your arrival time at London Kings Cross will be altered accordingly.
- 21-23 Jan, 2011: Train Departs from Edinburgh Waverley on 15.30, arrives in London Kings X at 20.38
- 11-13 Mar, 2011: Train Departs from Edinburgh Waverley on 17.30, arrives in London Kings X at 22.20
- 16-18 Sept, 2011: Train Departs from Edinburgh Waverley on 15.27, arrives in London Kings X at 21.49
- 23-25 Sept, 2011: Train Departs from Edinburgh Waverley on 15.27, arrives in London Kings X at 21.49








